Miniature Football Home  

Go Back   Miniature Electric Football Forums > Miniature Electric Football Tailgate Party
FAQ Members List Calendar Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #31  
Old 06-12-2009, 04:34 PM
FrustratedFinFan FrustratedFinFan is offline
Coach
 
Join Date: Apr 2007
Location: California
Posts: 395
Default

Basing might not take too long for me.....but painting and detailing and customizing sure does So...if I had to start from scratch to put my Utes together, it would take me weeks to finish. I don't always have a lot of time to devote to the hobby...especially since I have other hobbies!!!

Basing isn't too difficult for me now....but it used to be. The best advice I can give here is TAKE WHAT THE BASE GIVES YOU and don't try to make it something it isn't. If a base is naturally fast or strong....enhance that. If the base tends to loop, fine, don't work too hard to straighten it out....use that loop for a blitzer or back who can attack the perimeter of the "D." This method speeds up basing a team....and in the end, probably makes it a better team

Last edited by FrustratedFinFan : 06-12-2009 at 05:01 PM.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On
Forum Jump

All times are GMT -4. The time now is 01:16 PM.

Powered by vBulletin Version 3.6.2
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.